Ahmadian Fard Fini, A, Rashidi, T H, Akbarnezhad, A and Travis Waller, S (2016) Incorporating Multiskilling and Learning in the Optimization of Crew Composition. Journal of Construction Engineering and Management, 142(05).

Hammad, A W A, Akbarnezhad, A, Rey, D and Waller, S T (2016) A Computational Method for Estimating Travel Frequencies in Site Layout Planning. Journal of Construction Engineering and Management, 142(05).

Ilbeigi, M, Ashuri, B and Shayegh, S (2016) Price Adjustment Clauses and Submitted Bid Prices for Major Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 142(05).

Ioannou, P G and Yang, I (2016) Repetitive Scheduling Method: Requirements, Modeling, and Implementation. Journal of Construction Engineering and Management, 142(05).

Lopez, R, Chong, H, Wang, X and Graham, J (2016) Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects. Journal of Construction Engineering and Management, 142(05).

  • Type: Journal Article
  • Keywords: Building information modeling (BIM); Three-dimensional (3D); Four-dimensional (4D); Comparative; Software; Planning; Scheduling; Information technologies;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001094
  • Abstract:
    Building information modeling (BIM) fundamentally requires the importation of a three-dimensional (3D) model with a series of repository data. Numerous studies have been conducted to clarify the philosophy of BIM and promote its adoption in construction and engineering projects. The primary contributions of this research to the construction engineering and management body of knowledge are the technical review, analysis, and appraisal of various issues concerning the usability of four-dimensional (4D) BIM. The research aims to determine the readiness and development of 4D BIM. A technical literature review was conducted of various BIM software websites, journal articles, brochures, and videos about required 4D elements. A comparative analysis was conducted to compare the technical (TECA) and project-planning functionality (PPFA) aspects of developing 4D models with features provided by available BIM software. This analysis yielded matrices that can be used to guide decision making on which BIM software to invest in. The results reveal that all of the software packages in their way serve the purpose of developing a 4D BIM model.

Lucko, G, Araújo, L G and Cates, G R (2016) Slip Chart–Inspired Project Schedule Diagramming: Origins, Buffers, and Extension to Linear Schedules. Journal of Construction Engineering and Management, 142(05).

Prego, F J, Solla, M, Núñez-Nieto, X and Arias, P (2016) Assessing the Applicability of Ground-Penetrating Radar to Quality Control in Tunneling Construction. Journal of Construction Engineering and Management, 142(05).

Saleem, M, Al-Kutti, W A, Al-Akhras, N M and Haider, H (2016) Nondestructive Testing Procedure to Evaluate the Load-Carrying Capacity of Concrete Anchors. Journal of Construction Engineering and Management, 142(05).

Salehipour, A, Naeni, L M, Khanbabaei, R and Javaheri, A (2016) Lessons Learned from Applying the Individuals Control Charts to Monitoring Autocorrelated Project Performance Data. Journal of Construction Engineering and Management, 142(05).

Sierra, L A, Pellicer, E and Yepes, V (2016) Social Sustainability in the Lifecycle of Chilean Public Infrastructure. Journal of Construction Engineering and Management, 142(05).

Zhang, L, Wu, X and Liu, H (2016) Strategies to Reduce Ground Settlement from Shallow Tunnel Excavation: A Case Study in China. Journal of Construction Engineering and Management, 142(05).